A towboat pushes barges carrying bulk cargo through a lock on a river next to a dam structure.

Resources

Home Resources

BOAT POSITIONS

Boat River Milepoint As of (CST) MP 0500 Direction

November 20, 2026 River Operating Conditions Tow Size Restrictions: All barges transiting northbound LMR 303 – 869, effective October 26, 2026. All barges transiting southbound LMR 869 – 585, effective November 21, 2026. River Alerts and Closures: River Conditions: Upper Mississippi: Water levels appear to be holding steady from St. Paul down through St. Louis. St. Louis: Water levels show a steady decline from STL down through Columbus, KY. Illinois: Water levels are holding steady along the IL river. Ohio: River levels are holding steady throughout the Ohio River System. Lower Mississippi: River levels are falling throughout the Lower Mississippi segment. Lock Outages: Arkansas River: • Murray Lock and Dam (No. 7) NM 125.4 – The 70-foot width restriction remains in effect, and the partial daytime closure is also in effect from 7 a.m. to 7 p.m. through 12 December 2026. • Toad Suck Lock and Dam (No. 8) NM 155.9 – The 70-foot width restriction remains in effect, and the partial daytime closure is also in effect from 7 a.m. to 7 p.m. through 12 December 2026. • Ormond Lock and Dam (No. 9) NM 176.9 – The 70-foot width restriction has been lifted. A daily partial daytime closure remains in effect from 7 a.m. to 7 p.m. through 12 December 2026. • Trimble Lock and Dam (No. 13) NM 292.8 – The 70-foot width restriction has been lifted but partial daytime closure remains in effect from 7 a.m. to 7 p.m. through 24 November 2026. Gulf Activity: No activity to report at this time.


While we strive to ensure accuracy of this information, at times the situation can be dynamic and changing quickly. Therefore, we recommend that you consult with the appropriate Ingram contact for critical shipments that may be affected by these notices before making decisions.

Last updated: 2026-11-27 21:10:35

Lock Delays

ALLEGHENY RIVER
Location
ALL LOCK NO. 4
MP
24.2
From
10/05/2026 12:00am
To
12/18/2026 11:59pm
Reason
This lock will be closed to operation Oct 5 – Dec 18. This will be a full river closure for the duration of the work.
GULF WEST INTRCST WW
Location
BRAZOS RIVER FLOODGATES
MP
401.2
From
07/06/2026 07:00am
To
12/31/2026 07:00pm
Reason
J&S Contractors work is extended through 31 December 2026, repairing additional allisions in the area where the contractor is working on the North Guidewall of the West Brazos River Floodgates. Daily closures Monday-Friday from 07:00-19:00.
KANAWHA RIVER
Location
LONDON LOCK (2)
MP
82.8
From
06/30/2026 12:00am
To
03/01/2027 11:59pm
Reason
The main lock chamber remains closed until further notice. Updates to this notice will be published as they become available.
UPPER MISSISSIPPI
Location
UMR LOCK NO. 19
MP
364.3
From
12/05/2026 12:00am
To
12/14/2026 12:00am
Reason
Closed 05-Dec-26 thru 14-Dec-26 from 0700-1900 daily. Lock is open overnight.
Location
UMR LOCK NO. 22
MP
301.2
From
01/04/2027 12:00am
To
01/18/2027 11:59pm
Reason
Closed to perform the electrical service switchover.
Location
UMR LOCK NO. 2
MP
815.2
From
12/01/2026 12:00am
To
03/01/2027 11:59pm
Reason
Closed for repairs to their tow rail systems from 01 December, 2026 to 01 March, 2027.
Location
UMR LOCK NO. 3
MP
796.9
From
12/01/2026 12:00am
To
03/01/2027 11:59pm
Reason
Closed for repairs to their tow rail systems from 01 December, 2026 to 01 March, 2027.
Location
UMR LOCK NO. 5
MP
738.1
From
12/07/2026 12:00am
To
03/08/2027 11:59pm
Reason
Closed for miter gate anchorage replacements from 07 December. 2026 to 08 March, 2027.
Location
UMR LOCK NO. 6
MP
714.3
From
12/07/2026 12:00am
To
03/08/2027 11:59pm
Reason
Closed for miter gate anchorage replacements from 07 December. 2026 to 08 March, 2027.
Location
UMR LOCK NO. 19
MP
364.3
From
12/15/2026 12:00am
To
03/14/2027 11:59pm
Reason
Fully closed for river wall bullnose foundation and wall demolition.

River Stages

Barge Registry

Barge Registry PDF

This Barge Register is an estimate of the available tons to be loaded at the specified drafts for each listed barge. Shipper or its subcontractors have an obligation to determine cargo weight using scales or other verifiable methods. If Shipper or its subcontractors cannot locate a barge on this Barge Register, or if there is any hesitation as to the accuracy of the information reported on this Barge Register, Shipper has an obligation to contact Ingram Barge Company to determine the accuracy of the information for loading estimation purposes.

Liquid Strappings

Weather Conditions